Login Book premium now Info

Detail.de - Architektur und Bau Portal

Parking-Deck Canopy in Linz


Project description

"A lightweight steel-and-membrane construction was developed, which, in case a parking garage is built, can be disassembled quickly and set up again on another site. Due to the high degree of prefabrication, the construction of the entire roof took just 4 weeks. The structure consists of a steel framework with 15 rectangular fields measuring 11 ≈ 18 m each; they were assembled to a great extent on the ground and hoisted to the exact height."

Project details

building type: traffic buildings
support structure construction: frame construction
facade construction: building envelope
roof construction: pitched roof
support structure material: steel/aluminium
facade material: textile
roof material: textile
issue no.: 01-02/2009

Name of architect

form,art

Source

DETAIL 01-02/2009

Further information

form,art

More inspirations

Popular projects